1. Standard route planning workflow

Route planning is automatically completed based on the built 3D model: the system identifies bridge structural features → generates waypoints per member and accuracy requirements → automatically sets shooting parameters → outputs a flyable route. Modeling is the prerequisite for route planning, and modeling and route planning can be completed the same day.

2. Planning duration by bridge type

Bridge scale Duration Description
Routine small/medium bridges Minutes Fully automatic generation from 3D model
Extra-large bridges Same-day finalization Manual fine-tuning after automatic generation
Special-structure bridges Depends on complexity Control areas need point-by-point verification

3. Advantage over traditional planning

Traditional manual point-by-point planning relies on site surveys and manual layout, often taking days for a single bridge; RIEJIAN’s automated planning compresses the cycle to minutes, with standardized, reusable routes that significantly reduce project preparation time.

4. Applicable conditions and scenarios

  • Initial route design for new inspection projects
  • Route reuse and updates for annual re-inspection
  • Advance preparation for large-scale road network batch inspection

5. Notes

Route planning depends on the 3D model; bridges without modeling must complete modeling first; routes involving control areas (railway, navigation) must be verified per the competent authority’s access requirements.