1. Why is a dock not suitable for bridge inspection?

Bridge inspection cycles are mostly one month, one quarter or even 1-3 years, far lower than the high-frequency needs of traffic inspection, so a fixed dock is used extremely infrequently with poor return on investment. Current mainstream dock platforms (such as DJI docks) have limited payload and cannot carry RIEJIAN’s high-resolution camera and under-bridge navigation module, and cannot support operations in GPS-denied areas under the girder.

2. What scenarios suit a dock better?

Fixed docks suit high-frequency scenarios such as road debris and traffic congestion patrols that may occur every day. For infrastructure inspections like bridges, the dock solution is currently a pseudo-need.

3. How are dispersed bridges served?

Scenario Solution
High-frequency traffic inspection Fixed dock applicable
Bridge inspection (low frequency) Multiple batteries + vehicle transfer
Dispersed bridges On-site service + portable equipment

4. Applicable conditions and scenarios

  • Dock can be evaluated for high-frequency, routine traffic patrol scenarios
  • Bridge inspection uses multiple battery rotation and vehicle transfer
  • Specific solutions evaluated by project scenario

5. Notes

If exploring a dock solution, evaluate return on investment on the premise of high-frequency business scenarios; bridge inspection still relies mainly on on-site operations and vehicle transfer.