1. What is the automatic scoring process?
The automatic scoring process is: configure the bridge type and corresponding parts → set weights for each part per the evaluation standard → split parts into specific members → assign detected defects to their part and member → calculate based on weights and the evaluation formula → output the final score when generating the report.
2. Where does manual participation occur?
The system comes with a built-in standard configuration requiring minor manual modification and configuration; after defect scale rating, professional engineer manual review is needed to ensure scoring accuracy, rather than a fully automated result without human involvement.
3. Applicable scenarios for scoring
| Scenario | Application |
|---|---|
| Periodic inspection by inspection organizations | Bridge technical condition scoring |
| Member-level scoring | Calculate with defects mapped to members |
| Standard compliance | Output per evaluation formula |
4. Applicable conditions and scenarios
- Periodic inspection scoring scenarios for engineering inspection organizations
- Projects configuring weights and members per the evaluation standard
- Compliant workflow of automatic calculation + manual review
5. Notes
Scoring accuracy depends on configuration and review quality; it is recommended that professionals with periodic inspection experience participate in configuration and review.