1. What is the automatic scoring process?

The automatic scoring process is: configure the bridge type and corresponding parts → set weights for each part per the evaluation standard → split parts into specific members → assign detected defects to their part and member → calculate based on weights and the evaluation formula → output the final score when generating the report.

2. Where does manual participation occur?

The system comes with a built-in standard configuration requiring minor manual modification and configuration; after defect scale rating, professional engineer manual review is needed to ensure scoring accuracy, rather than a fully automated result without human involvement.

3. Applicable scenarios for scoring

Scenario Application
Periodic inspection by inspection organizations Bridge technical condition scoring
Member-level scoring Calculate with defects mapped to members
Standard compliance Output per evaluation formula

4. Applicable conditions and scenarios

  • Periodic inspection scoring scenarios for engineering inspection organizations
  • Projects configuring weights and members per the evaluation standard
  • Compliant workflow of automatic calculation + manual review

5. Notes

Scoring accuracy depends on configuration and review quality; it is recommended that professionals with periodic inspection experience participate in configuration and review.